The Performance test is performed on a similar setup to the Stability test. JMeter will send a large number of REST requests and will then retrieve those requests.
  
- Performnce test plan will be the same as the stability test plan except for some differences listed below:
+ Performance test plan will be the same as the stability test plan except for some differences listed below:
  
 -- Increase the number of threads from 5 to 60.
 +- Increase the number of threads from 5 to 20.
  - Reduce test time to ninety minutes.
  - Calculate the amount of requests handled in the time frame.