summary |
shortlog |
log |
commit | commitdiff |
review |
tree
raw |
patch |
inline | side by side (from parent 1:
d50aa19)
Increase timeout to 120 minutes for clamp-maven-clm-master,
due to CLM job was not finished after 90 minutes.
Issue-ID: CIMAN-1
Signed-off-by: Bengt Thuree <bthuree@linuxfoundation.org>
Change-Id: I2c77a13a2745f97473c3a9d0e00b8fe910bd4d76
branch: 'master'
mvn-settings: 'clamp-settings'
build-node: ubuntu1604-docker-8c-8g
branch: 'master'
mvn-settings: 'clamp-settings'
build-node: ubuntu1604-docker-8c-8g