summary |
shortlog |
log |
commit | commitdiff |
review |
tree
raw |
patch |
inline | side by side (from parent 1:
3518b6d)
Increase timeout to 90 minutes for clamp-maven-clm-master,
due to CLM job was not finished after 60 minutes.
Change-Id: Iad08b14ee76d071677983c37d4e5a6ac61f00517
Issue-ID: CIMAN-1
Signed-off-by: Bengt Thuree <bthuree@linuxfoundation.org>
branch: 'master'
mvn-settings: 'clamp-settings'
build-node: ubuntu1604-docker-8c-8g
branch: 'master'
mvn-settings: 'clamp-settings'
build-node: ubuntu1604-docker-8c-8g